Electricity Connection Permit Charges

These are fees paid to the local electricity board or utility provider to process and approve industrial power connections.

  • Application and processing fees typically range from ₹10,000 to ₹50,000
  • Load sanction fees vary based on the applied capacity (e.g., ₹500 to ₹1,000 per kW)
  • Security deposit may be required based on connected load and tariff category

Water Supply Permit Charges

Permit charges for water include connection approvals and municipal development fees, if applicable.

  • Connection fees generally range from ₹25,000 to ₹75,000 for industrial plots
  • Additional charges may apply for water meters, tapping points, and deposits
  • Long-distance connections may require added infrastructure contribution

Sewer and Drainage Connection Permits

Municipal bodies may charge for connection approvals, inspection, and infrastructure usage.

  • Permit charges range from ₹15,000 to ₹50,000 depending on location and pipe size
  • Inspection fees and one-time infrastructure levies may also be applied
  • Environmental clearance (if applicable) adds further documentation and fees