by Industrial Guide | Jun 13, 2025 | I - News
Scope of Geotechnical Testing Geotechnical investigation involves soil sampling, testing, and reporting to evaluate the land’s load-bearing capacity, drainage behavior, and suitability for construction. Includes borehole drilling, standard penetration tests (SPT), and...
by Industrial Guide | Jun 13, 2025 | I - News
Typical Erosion Control Measures Erosion control involves installing features that prevent soil displacement from wind, rain, or runoff during and after construction. Common methods include silt fencing, drainage channels, and turfing. Essential for sloped, newly...
by Industrial Guide | Jun 13, 2025 | I - News
Earthwork Requirement Overview Earthwork refers to the volume of soil that needs to be excavated (cut) or added (fill) to achieve a level surface for construction. The exact quantity depends on site slope, soil condition, and the desired platform level. Flat or gently...
by Industrial Guide | Jun 13, 2025 | I - News
Basic Vegetation Clearing Clearing grass, shrubs, and small bushes is a standard first step in site preparation. It typically involves light machinery or manual labor. Estimated cost: ₹5 to ₹10 per square foot For 1 acre (43,560 sq ft), total cost is approximately ₹2...
by Industrial Guide | Jun 13, 2025 | I - News
Site Clearing Costs Site clearing includes removal of vegetation, debris, rocks, and existing structures to prepare the land for development. Costs depend on plot size, terrain, and vegetation density. For basic clearing, the cost ranges from ₹10 to ₹25 per square...
by Industrial Guide | Jun 13, 2025 | I - News
Absorption Rate Definition Market absorption refers to the pace at which industrial land or built-up space is sold or leased over a defined period. Assumptions are based on local demand, competition, and infrastructure readiness. Typically measured in acres or square...