Earthwork Requirement Overview
Earthwork refers to the volume of soil that needs to be excavated (cut) or added (fill) to achieve a level surface for construction. The exact quantity depends on site slope, soil condition, and the desired platform level.
- Flat or gently sloping sites require minimal cut and fill
- Undulating terrain or low-lying plots require significant earth movement
- Engineering surveys determine precise volume in cubic meters
Typical Cut and Fill Estimates
For moderate grading on industrial land, the cut and fill requirement typically ranges between 500 to 1,500 cubic meters per acre.
- Cut volume is the soil removed from elevated areas
- Fill volume is the soil added to raise low-lying sections
- Balanced sites (cut ≈ fill) reduce cost and off-site hauling