Electricity Connection Permit Charges
These are fees paid to the local electricity board or utility provider to process and approve industrial power connections.
- Application and processing fees typically range from ₹10,000 to ₹50,000
- Load sanction fees vary based on the applied capacity (e.g., ₹500 to ₹1,000 per kW)
- Security deposit may be required based on connected load and tariff category
Water Supply Permit Charges
Permit charges for water include connection approvals and municipal development fees, if applicable.
- Connection fees generally range from ₹25,000 to ₹75,000 for industrial plots
- Additional charges may apply for water meters, tapping points, and deposits
- Long-distance connections may require added infrastructure contribution
Sewer and Drainage Connection Permits
Municipal bodies may charge for connection approvals, inspection, and infrastructure usage.
- Permit charges range from ₹15,000 to ₹50,000 depending on location and pipe size
- Inspection fees and one-time infrastructure levies may also be applied
- Environmental clearance (if applicable) adds further documentation and fees