Power Supply Connection
The cost of electrical infrastructure depends on load requirement, distance from the nearest substation, and transformer capacity.
- Basic industrial connection (up to 50 kW): one lakh to three lakh
- Higher load (above 100 kW): five lakh to fifteen lakh
- Additional costs for transformer, cabling, poles, or approvals if off-grid
Water Supply and Borewell Setup
Water access can be arranged through municipal connections, borewells, or private tankers, depending on the location and local permissions.
- Municipal connection and pipelines: one lakh to two lakh
- Borewell drilling and pump setup: one lakh to three lakh
- Overhead tank and basic plumbing: fifty thousand to one lakh
Road and Internal Access Development
If the site lacks direct road access or internal paths, developers must invest in base leveling, road compaction, and entry/exit points.
- Basic internal road (stone base or compacted): two lakh to five lakh per 100 meters
- Asphalt or concrete internal road: five lakh to eight lakh per 100 meters
- Gate, compound wall, or entry path: additional two lakh to five lakh
Drainage and Stormwater Systems
Industrial plots require basic drainage systems to prevent flooding or soil erosion. This includes surface grading, channels, and soak pits.
- Basic open drain construction: one lakh to two lakh
- Underground stormwater drains (if required): three lakh to six lakh
- Rainwater harvesting systems (optional): one lakh to two lakh
Total Estimated Range
For a standard 1 to 5 acre site with moderate infrastructure needs:
- Utilities and infrastructure setup may range from ten lakh to thirty lakh
- Higher costs apply for remote locations or larger power and road needs
- Government industrial parks may reduce this cost if basic infra is pre-provided